Beginning of construction:   2001
Completion:   2002
Usable floor area:   12,000 m²
Gross floor area:   15,300 m²
Building volume:   56,500 m³
Total costs:   25.0 mio. €

Scope Of Planing


Technical Equipment
Thermal Building Physics

Building project


The DyStar Headquarter building consist of a front office building, seven stories high, and a floor area of 1.300 m² per story. It has a full basement used for building equipment, computer installations and an archive. The back building serves as a twostory laboratory with a floor area of about 2.500 m² per story. It has partly a basement for sanitary rooms and storage.

Construction


Office building with seven stories and basement, floors by flat slabs, shear walls around stair ways and elevators, strip and square footings.
Total floor space 10,300 m², volume of the building: 39.000 m³. Industrial building for laboratory and shops, partly with basement, floor by flat slabs, concrete shear walls, strip and square footings. Area of one floor: 2.500 m², total volume of the building: 17.500 m³

Client


Infraserv GmbH & Co. Höchst KG

Architect


JProf. Bremmer, Lorenz, Freilinghaus Architekten, Friedberg, HOAI contract