Site development of the shopping centre New construction of a footpath and cycle path tunnel

Objectinformation


Beginning of construction:   2004
Completion:   2004
Usable floor area:   2.50 m
Gross floor area:   0.15 mio. €
Inner Width:   5.50 m
Clear Width:   9.75 m

Scope Of Planing


Object Planning Engineering Work
Structural Design
Development Measures

Project


New construction of a footpath and bicycle path tunnel below the new connecting ramp between Rosa-Luxembourg street and Erich-Ollenhauer cycle due to development measures for the expansion of the “Nordwestzentrum” in Frankfurt. The structure is made as frame structure of reinforced concrete with a spread foundation and attached cantilever retaining walls.

Client


KG Nordtrakt Verwaltungsgesellschaft mbH, Limescorso 8, 60439 Frankfurt/M.