Rural District Office/Municipality

Objectinformation


Usable floor area:   3,400 m²
Gross floor area:   10,150 m²
Gross building volume:   30,000 m³

Scope Of Planing


Technical Equipment

Project


New construction of an administration building with a three floor underground parking by means of modern property management system (e. g. LON for single room control; temperature, lighting, presence, sun protection in the rooms are regulated) as well as energy supply plants (block heat and power plant on basis of natural gas + 2 boiler plants) in an optimally managed network.
The planning and execution comprises heating system with block heat and power plant, ventilating system, sanitary engineering with storm water plant, sprinkler system, fire alarm system, solar plant, electrical system with LON components, low temperature plant, lightning protection, video control system, lift systems and building control system with approx. 3000 points of information.

Client


Kreis Bergstrasse Heppenheim, Magistrat der Stadt Heppenheim

Architect


Hoechstetter und Partner, Darmstadt