New Textile Machinery Factory

Objectinformation


Beginning of construction:   2005
Completion:   2007
Building volume:   210,000 m³
Total costs:   24.3 mio. €

Scope Of Planing


Overall planning
Object Planning
Structural Design
Technical Equipment
Thermal Building Physics
Fire Protection

Building project


The total cost include the new production hall with 2100 m² office space and infrastructure works. The roof of the new hall has a free span of 2 x 32 m in order to provide flexible arrangement of the production lines with respect to future rearrangements and adaptation to new requirements.

A former industrial hall shall be reconstructed for use as a new two level development centre. About 3600 m² laboratory and testing area is located on the first floor. Another 3600 m² area is available for administration and design on the second floor.

Construction


New machinery hall:
Prefabricated reinforced concrete structure with wide span steel girders. The offices are integrated into the hall using brickwork structure with flat prefabricated concrete slabs.
Development center:
A new reinforced concrete structure is erected inside the existing hall.


Client


Karl Mayer Textilmaschinenfabrik GmbH, Obertshausen

Complete Planning