New Logistics Center, Karl Mayer Textile Machin

Objectinformation


Beginning of construction:   2006
Completion:   2006
Usable floor area:   4,700 m²
Gross floor area:   6,100 m²
Building volume:   37,000 m³
Total costs:   2.7 mio. €

Scope Of Planing


Overall planning
Object Planning
Structural Design
Technical Equipment
Thermal Building Physics
Fire Protection

Building project


For the reorganisation of the production in plant No. II in Obertshausen, the existing halls 9/10 will be converted into a logistic center.

It contains the central storage and distribution for parts and components for the production and replacement parts. In order to achieve a high reliability in the distribution of parts, in particular for the production, a state of the art stock-keeping technic will be installed. In hall 10, a small component depot for 11,000 parts will be installed on an area of 575 m². Hall 9 will contain storage place for more than 800 pallets on an area of 550 m².

Construction


The base dimensions of the existing halls 9/10 are 123 m x 44 m with heights between 4.5 m and 8 m. The bearing structure consists of the steel frames. The two story appendix on the west side consists of a masonry/concrete structure.

Client


Karl Mayer Textilmaschinenfabrik GmbH, Obertshausen

Complete Planning